Thursday, October 15, 2009

Our first solar project.

Today we started the first phase of construction on the first solar project in Glen Lake. This is a cutomer that I have been working with for awhile. We will be installing a 2 kw system with a tracker. This is the post that we installed for the tracker to mount on. It is 8" around and 21' long. We placed it down a hole 30" round and 7' deep. I will be starting on the electrical end of it later next week. We also are making provisions for a future additional 2kw of solar and a possible 3-5 kw wind turbine. So if you would like to do something like this then give us a call and lets talk about solar for you.