Saturday, February 14, 2009

Meeder Project


We finished the Meeder Project yesterday. The turbine is mounted on a 45' tower. It went up with out a hitch. Antrim County Crane came out and installed it for us and did a good job.

The weather some what cooperated with us, other than the snow which made it difficult to get the pole moved around. We managed to get the loader stuck.

But no the less it is up, now if we would get some wind things would be much better.

Keep your eyes open the newspaper was there and did a story on us installing the turbine.